Where work gets stuck
A shop-floor check can be completed on paper and entered into another tool later. If a defect, shortage or late delivery is recorded separately from the work order, supervisors may only discover it when the next shift starts or the job stalls.
What we can build
Digital quality checks
Give operators a checklist tied to the product, line or work order. Keep supporting evidence with the inspection and assign failed checks to a reviewer.
Work-order and stock visibility
Show planners the latest confirmed inventory figures and work-order status from the systems they already use. Flag differences for reconciliation.
Supplier correspondence
Match order acknowledgements and delivery updates to purchase orders. Route changed dates or quantities to purchasing before anyone updates the planning system.
From a failed check to a documented resolution
- An operator opens the work order and completes the relevant quality checklist.
- A failed result creates an exception with the reading, location and supporting evidence.
- A supervisor assigns corrective work and records the disposition after review.
- The work-order dashboard reflects the outcome so the next shift can see what was resolved.
What we would connect
Start with the ERP or production system and the quality records the team uses today. Confirm work-order and item identifiers, where operators enter data, and what happens during a network interruption.
How to measure a pilot
Pilot one line or inspection type. Measure time from detection to assignment, exceptions still open at shift handover and manual re-entry per inspection.